CLOSED-Washington Park Arboretum, Multi-use Trail Project RFQ-PARKS-31313

Original Date Posted: March 13, 2013 11:50 am


Due Date: 3/29/13, 3:30 PM (Pacific)

City of Seattle Request for Consultant Services

Project Title:  Washington Park Arboretum, Multi Use Trail Project
Click here to access the RFQ
Additional docs to assist in the RFQ response:
Doc #1: Multi Use Trail & North Entry (future) pdf.
Doc #2: Multi Use Trail & North Entry (background) pdf.
Doc #3: Multi Use Trail – Specific Scope pdf.

ADDENDUM
Addendum #1 – Issued 3/15/2013.docx
Addendum #2 – Issued 3/19/2013 (Optional Pre-Submittal Site Walk).docx
Addendum #3 – Issued 3/22/2013 (Q&A).docx
Addendum #4 – Issued 3/22/2013.docx
Addendum #5 – Issued 3/35/2013.docx
Addendum #6 – Issued 3/26/2013.docx  NEW DUE TIME POSTED!

3/18/2013 Optional Pre-Submittal Sign-in Sheet.pdf
3/21/2013 Site Walk Sign-in Sheet.pdf

RFP Due Date: 3/29/13, 8:30am

Scope of Work: The Seattle Parks and Recreation Department is seeking qualified consultant teams to provide professional services to design the 1.2 mile, multi-use, trail through the Washington Park Arboretum and apply for permits in accordance with the associated timeframe.  Consultant team shall review all background information to date to inform the design, (please review attachments at the end of this document.)  Consultant Team is expected to utilize existing CAD drawings and perform work tasks that include, but not limited to the following:

  • Design Development:  Submit final JARPA (Draft JARPA completed during conceptual design phase).  Further design of CAD level layout of multi-use trail. Plans, outline technical specifications and construction cost estimate.  Meetings: Parks Proview, Public Meeting.
  • 65% Construction Document plans, technical specifications index, construction cost estimate.  Meetings: Parks Proview, Arboretum Botanical Garden Committee, UW Curatorial Committee, Seattle Pedestrian Advisory Board, Seattle Bicycle Advisory Board.
  • 95% Construction Document plans, complete technical specifications, construction cost estimate.  Meetings: Parks Proview, UW Curatorial Committee
  • Completed (100%) Construction Document plans, technical specifications, construction cost estimate
  • Revision to completed (100%) Construction Document plans, Project Manual.
  • Bidding Assistance
  • Construction Administration

The full RFP, Scope of Work and associated documents can be viewed and downloaded on this page.

Construction Cost Estimate: Not to exceed $5,000,000

City Contact Information: Please email Andy Sheffer, andy.sheffer@seattle.gov or 206-684-7041 if you are interested in submitting a proposal.

[Ad run dates: March 13-March 18]