Link to Consultant Opportunities Home Page Link to Consultant Opportunities Home Page Link to Consultant Opportunities Overview Link to Consultant Opportunities Contact Us
The The Consultant Connection Home Page The The Consultant Connection Home Page CityLink Seattle
Welcome to The Consultant Connection Blog
«    »


Search for posts

Categories


Recent Posts


August 2023
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
28293031  

Tags


Contributors

Quick Links

CLOSED-For Release on 8/18/2023: On-Call Professional Engineering Consultant Services for Preliminary Engineering Studies at Various Municipal Buildings; RFQ CD 2023-040

Original Date Posted: August 11, 2023 8:00 am


Due Date:

Submittals Due by 5 PM PST, on September 21, 2023 RFQ# CD 2023-040

RFQ Releasing on August 18, 2023 at 8 AM PST

CITY OF SEATTLE

REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) #CD 2023-040

On-Call Professional Engineering Consultant Services for

Preliminary Engineering Studies at Various Municipal Buildings

PROJECT LOCATION:  Various – throughout the Facilities and Administrative Services (FAS) Capital Development (CD) Building Portfolio

PROJECT DESCRIPTION: The City of Seattle Department of Finance and Administrative Services (FAS), Capital Development Division (CD) seeks consultants to provide engineering services for production of preliminary engineering studies for development of options for future building decarbonization and electrical vehicle charging infrastructure. Tasks will involve studying existing plans and utility information, walking sites to verify existing conditions, drafting narrative basis of design memos for proposed equipment solutions, estimated electrical capacity required and early design phase cost estimation.

Minimum qualifications for this solicitation include the following:

The following are minimum qualifications and licensing requirements the consultant must meet in order to be eligible to submit and for any contract that is awarded. Submittals must clearly demonstrate these minimum qualifications. Those that are not clearly responsive to these minimum qualifications shall be rejected without further consideration: 

  1. The Prime Consultant must be licensed to do business in the State of Washington and the City of Seattle prior to contract execution. The provisions of any contracts resulting from this selection process must be in full compliance with all applicable laws and ordinances regarding equal employment opportunity and affirmative action. Refer to sections 7.10 and 7.11 for further information regarding licensing requirements.
  2. The Consultant’s submittal shall indicate the range of projects (minimum three (3) projects) on which the proposing firm has previously worked highlighting its experience with energy efficiency upgrades, electrification of fossil fuel equipment, and electrical service upgrades in the last ten (10) years. 
  3. Provide (3) references: previous client / owners / architectural partners; that have worked with the Prime in the last ten (10) years to demonstrate client satisfaction. Include contact name, phone number, and address and name of project(s). Exclude any references within City of Seattle Finance and Administrative Services: Capital Development.

Additional Desired Consultant Qualifications

The following are desired qualifications the consultant is requested to submit as an Executive Summary of Consultant Qualifications. Responses will be considered in scoring submittals.

  1. Project experience documentation and range of services in all that apply to demonstrate quality design and technical services–
  2. Energy efficiency upgrades
  3. Electrification projects with focus on efficient transition to electrical equipment
  4. Electrical service upgrades for existing buildings
  5. Experience with common FAS portfolio building types: fire stations, police precincts, downtown core office buildings
  6. Competence and Broad skills –
  7. Communicate effectively with project manager, department heads and personnel, general contractors, building engineers and regulatory / permitting agencies. Demonstrate ability to interview clients and accurately gather and assemble all necessary information and data needed to successfully complete projects and meet the client’s needs and goals.
  8. Sustainable design that seeks to enhance environmental quality and long-term efficiency.
  9. Ability to understand and coordinate load reduction methods before selecting equipment
    1. Deep experience with design of heat pump systems for space conditioning and water heating
  10. Creation of basis of design memo and peer review of engineer of record (EOR) to verify the design intent is maintained through design phase.
  11. Manage subconsultant team, whenever subconsultants are necessary.
  12. Demonstrated quality of design and technical expertise. Clear communication of technical topics to non-technical audience to justify projects to Capital Development leadership or other non-technical CoS stakeholders.
  13. Strategies and processes to prevent and resolve claims and/or support Owner’s efforts in claims resolution.
  14. Firm Characteristics
  15. Demonstrate firm’s approach, philosophy and goals seek to further the practice of quality design, technical, and sustainable design.
  16. Identify the key members of your firm as they relate to the Consultant Qualifications. State specific licensing and certification key members have in order to deliver the services called out in the scope of work.

The City of Seattle reserves the right to update the minimum qualifications prior to the publish date of the RFQ.

To receive a complete copy of the full RFQ, mandatory forms and the City’s boiler plate consultant contract terms, please visit the City of Seattle Bonfire site at: https://cityofseattle.bonfirehub.com/projects/102271/details

RFQ Documents will be available starting 8/18/2023 at 8 AM PST.

For additional questions contact RFQ Project Manager Erik Turner erik.turner@seattle.gov. Questions will be collected, and clarifications will be posted as part of the addenda process for the RFQ.

Consultant selection for this RFQ will be subject to all applicable laws and ordinances. The participation of women- and minority-owned firms is a high priority cultural value of the City of Seattle and is strongly encouraged.

Dates of RFQ publication in the Seattle Daily Journal of Commerce, August 11 and August 18, 2023. https://cityofseattle.bonfirehub.com/projects/102271/details


© 1995-2022 City of Seattle